14th October 2020
Please click on the below link to download the Pdf document.
Updated: Jun 22, 2021
14th October 2020
Please click on the below link to download the Pdf document.
A message from EKFB: Please find attached an advanced works notice advising of a full closure of Rocky Lane from 13th to 17th February, the road will be closed for 24 hours a day during these works. F
When will these works take place? Chiltern Road closure – Monday 6 to Friday 10 February Dobbins Lane closure – Monday 13 to Friday 24 February Both closures will be in place 24 hours a day throughout
AVTUG meets 4 times per year to hear people’s views on local public transport services. The next Annual General meeting of AVTUG, followed by a General Meeting of AVTUG, will take place at 2.00 pm on